- Bathroom RemodelingTubs, vanities, tile and fixtures
- Showers & Glass DoorsWalk-in showers, benches and glass doors
- Niches & Accent TileShower niches, mosaics and borders
- Kitchen RemodelingBacksplashes, floors and full kitchens
- Tile FloorsKitchens, baths, entries and patterns
- Custom Tile WorkPatterns, borders and one-off details
- PaintingWalls, ceilings, trim and doors
- CarpentryTrim, doors, framing and built-ins
- Full RemodelsEvery room, start to finish
- Outdoor PatiosStone and tile patios










A granite kitchen in Marblehead.
Green granite on every counter, a farmhouse sink under the window and new plumbing under the floor before any of it went in.


BeforeAfterDrag the line to compare
Want the same for your house? We answer right away and book the visit.
- 4
- Weeks on site
- 6
- Granite pieces, cut and fit on site
- 1
- Farmhouse sink, under the window
- Marblehead
- Massachusetts, on the North Shore
The job
Five steps, one crew.
Plumbing first, then the cabinets, then the stone. Each trade came in only when the one before it was done.
01/ 05
Week 101Under the floor
We opened the floor at the sink and ran new supply and drain lines before anything else went in.
Week 202Cutouts and fitting
Every piece of granite was dry fit, the sink cut out on site and the edges finished by hand.
Week 303Granite on the island
The island top went on in one piece, with the overhang sized for three stools.
Week 304Fridge wall and trim
Tall cabinets around the fridge, a short return of granite and new trim to the ceiling.
Week 4Handed over
Stone sealed, the backsplash grouted and a walk-through with the owners.
Let’s build it.
Tell us about the job. We answer right away and book the visit.
Tell us about the job. We answer right away and book the visit.
Let’s build it.
Let’s build it.
Let’s build it.
Let’s build it.
Let’s build it.
Tell us about the job. We answer right away and book the visit.